|
1
|
|
|
2
|
- Mary Alice Annecharico / Rod MacNeil, SOM
- Mark Aseltine* / Mike Lazenka, ISC
- Robin Beck, ISC
- Doug Berger / Manuel Pena, Housing & Conference Services
- Chris Bradie / *Dave Carroll, Business Services
- Chris Field, GPSA (student)
- Cathy DiBonaventura, School of Design*
- Geoff Filinuk, ISC
- Bonnie Gibson, Office of Provost
- Roy Heinz / John Keane, Library
- Robert Helfman, Budget Mgmt. Analysis
- John Irwin, GSE
- Marilyn Jost, ISC
- Carol Katzman, Vet School
- Deke Kassabian / Melissa Muth, ISC
- James Kaylor / CCEB*
- Dan Margolis, SEAS* (student)
- Chris Massicotte, Audit & Compliance
- Kayann McDonnell, Law
- Donna Milici, Nursing
- Dave Millar, ISC
- Michael Palladino, ISC (Chair)
- Dominic A. Pasqualino / Audit & Compliance*
- David Seidell, Wharton*
- Dan Shapiro, Dental
- Mary Spada, VPUL
- Marilyn Spicer, College Houses*
- Steve Stines / Jeff Linso, Div. of Finance
- Ira Winston / Helen Anderson, SEAS, SAS, School of Design
|
|
3
|
- Summer
- 9/15
- 9/29
- 10/8
- 11/3
- 11/17
- 12/1
- 12/15
- Focus group sessions
- Setting the stage
- Security discussions (Part I)
- Security discussions (Part II)
- Operational briefing/baseline activities
- Strategic discussions
- Consensus building/preliminary rate setting
- State of the Union
|
|
4
|
- Date
- 12/15 - State of the Union
- Time
- Place
- Attendees
|
|
5
|
- Discuss revised assumptions
- Share cost-cutting measures
- Show N&T 6-year cash flow
- Show draft FY 05 rates
- Discussions and voting on new initiatives
- Preliminary rate setting
|
|
6
|
- Security concerns are a top priority as various viruses, worms, etc.
have reduced Penns productivity levels.
These concerns have constituted a significant portion of the Fall
NPTF discussions.
- 5 year phase-out of allocated monies ($2.317M) to occur from FY2003-07.
- Telecommunications surplus, operating efficiencies and increased costs
to offset allocated cost phase out.
- Aggregate PennNet, Telecommunications and Video service rate increases
projected at 1-2% maximum yearly, determined in conjunction with NPTF.
|
|
7
|
- Excellent bandwidth management techniques combined with a good Internet
strategy have eased the pressure on developing tiered network
connectivity options. However,
this will continue to be explored and evaluated as the need/opportunity
arises.
- Separate SLAs for College Houses and Greeknet for maintenance and
bandwidth.
- FY2005-09 budget assumes Next Generation PennNet project averages
$590k/year, down from original $837k/year. Funding source is
Telecommunications surplus.
|
|
8
|
- No rate increases for existing Telecommunications and Video services in
05, except PVN.
www.net.isc.upenn.edu/rates
- For FY2005 College House students will continue to be billed indirectly
as part of housing fees for baseline PennNet and Penn Video Network
services.
- Building entrance and router equipment are on a four-year replacement
cycle.
- Closet electronics and network servers are on a three-year replacement
cycle.
- N&T will run a fiscally self-sufficient GigaPoP (MAGPI) and break
even in FY 04 and beyond. Revenue and expense could approach $1M for
FY04.
|
|
9
|
- The CSF will subsidize approximately 850 wired, public lab connections
that have computers attached in FY2004.
TBD for FY2005.
- The growth rate in IP addresses from the schools/centers is projected to
increase by 1200 per year from FY2004-09.
- ISC managed wallplates projected growth at 1200 new per year.
|
|
10
|
|
|
11
|
- To retain and recruit appropriate N&T IT staff, 3% compensation has
been budgeted to include annual performance increases, equity increases,
bonuses, promotions and reclassifications from FY2005 - 09.
- In FY2004 a 54.2% overhead rate was projected to cover costs of
benefits, rent, training, computers, telephones, etc. Our FY05 overhead
rate is 53% for FY2005.
- The NOC will not be physically staffed (7x24x365) through FY2009. It will continue to operate from 6 AM
11 PM, M-F with the rest of the week covered by technical staff on
beepers.
- N&T total expense budget increases from $22M in FY 02 to only
$23.2M in FY 09.
|
|
12
|
|
|
13
|
- Lowering yearly NGP budget in FY 05-09 to $590k, down from $837k/year.
- Dropping 2 full-time contractors in FY 05.
- Dropping 4 part-time contractors in FY 05.
- Lowering voice systems expenses by $100k in FY 05.
- Outsourcing some job functions.
- Insourcing some job functions.
|
|
14
|
|
|
15
|
|
|
16
|
|
|
17
|
|
|
18
|
|
|
19
|
|
|
20
|
|
|
21
|
|
|
22
|
- Firewalls, VPNs, and intrusion-detection are tactical solutions, of all
which have an important role to play in Penn Information Security.
- The single most effective way to deploy resources against our
information security problems is in support of mastering host security.
- In support of that strategy, we plan the following activities:
- Run opt-in SUS server, seeking $28k to support students.
- Do not seek funds ($150k - $200k) for port traces and disconnects
associated with patch management policy.
|
|
23
|
- Provide proactive, high quality LSP and end-user security tools and
documentation supported by an ongoing campus-wide training and
awareness program:
- Web-based self-scanning/reporting
- End user-friendly security technical information for all supported
operating systems.
- 2-3 half-day or full-day LSP training sessions annually
- Ongoing end user awareness campaign supported by media ads, articles,
management communications, incentives and other campus-wide
communications.
|
|
24
|
- Challenge: Balancing increasing demand for services with the need to
provide cost effective services. Funding additional staffing to maintain
Provider Support Services at the desired levels given increasing demand.
- No positions added since 1997
- Drivers
- Anti-Virus and Security
- New Services (PennKey, Wireless, etc.)
- Increasing Demand
|
|
25
|
|
|
26
|
|
|
27
|
|
|
28
|
|
|
29
|
|
|
30
|
- NPTF makes rate recommendations.
- Finalize N&T FY 04 - FY 09 budgets.
- Rate recommendations presented to Provost.
- Final FY 05 rates established.
- Rates published in Almanac.
|
|
| Download File |