Top Priority
| ISC Division |
Programmer |
Start Date (mm/dd/yyyy) |
Expected Completion Date |
Brief Description |
Comments |
| Telecom |
CM |
8/2011 |
12/2012 |
Move goldfinger/Mysoft app to Virtual Machine on newer hardware. |
10/31/2011 - Dave said new vm will need a new ip address, which will require us to make some adjustments and contact Verizon.
11/16/2011 - Attempted the switch, but encountered problems. Emailed Compco to help with new plans which require us to do a new install.
11/30/2011 - Dave starting the new Mysoft install on the new vm.
2/10/2012 - VM setup and new mysoft install completed. Encountered problems with db upgrades and Chris is working with Compco.
7/5/2012 - So many problems with running costing on new vm. Did upgrade on leadfinger and found costing, at least of rejects worked.
8/28/2012 - Able to get call conversion working, but the Costing and Apply is experiencing the same problems on Leadfinger as it did
on the new mysoft-prod server. Decided to document all work done to date on this project.
9/24/2012 - Sent documentation to David Dimm, Angela at Windstream.
11/5/2012 - Documented plan for rebuilding vm and starting new Mysoft install.
12/19/2012 - New VM is built, oracle client installed. Next step is for Dave to install Mysoft, Pervasive and Crystal.
3/14/2013 - All software installed. Conversion/Costing-ApplyCalls processes working. Now testing cygwin/perl and scheduling processes on vm
3/27/2013 - Resolved Costing issues, including trunk group problems that caused voip to be costed without the discount.
4/1/2013 - Ran test cycle on mysoft-prod2 and asked Dave Dimm to work with Verizon to test ftping of call files.
5/8/2013 - Emailed Verizon to test ftp of call files. Tested successfully with Alissa Breedy. Dave to go ahead and setup VM on new machine
5/29/2013 - Inquired about status.
6/3/2013 - Inquired about status. Dave was hoping to get to it soon.
6/5/2013 - Inquired about status. Dave said he found out he needed to update the new VM environment first.
|
Other Work in Progress
| ISC Division |
Programmer |
Start Date (mm/dd/yyyy) |
Expected Completion Dt |
Brief Description |
Comments |
| Dawn,NCCS |
CM,TH |
2/1/2013 |
|
Reconcile Norstar System Charges |
2/4 - Provided Dawn the report she requested of System and Set charges for Norstars. About 327 charge records for approx total of $9600.
3/3 - Sent Dawn/Tom list of Norstar System Only Charges that remain in Mysoft. Tom said he would get back to me with ones that could be stopped.
About 100 system charges still billing for a total of $8100/month.
|
| Dawn,NCCS |
CM,TH |
1/31/2013 |
|
FAX Line Analysis |
1/31 - Dawn requested report of fax lines in Mysoft and their usage so they could estimate pricing for offering a cloud-based fax service.
2/1 - Chris explained to Tom that fax lines may not be accurately tagged in Mysoft and that the first step should be reconciliation against Tom's list
of fax lines. Chris generated a report of phone numbers in Mysoft labeled as "Fax Lines" and sent it to Tom to verify. There were 1054. Tom
decided they didn't want to do the reconciliation first.
2/6 - Chris provided usage data for 9/12, 10/12 and 1/13 for all lines in Mysoft labeled as fax lines and sent it to NCCS.
|
| Telecom |
CM |
9/12/2012 |
10/19/2012 |
Develop new nightly process to stop billing for PNP sets in Mysoft. |
10/1 - Installed but just with reporting. Emails being sent to CM.
10/18- Brenda now manually stopping sets in Mysoft daily. |
| TSS |
CM |
7/21/2011 |
12/31/2012 |
SRB-Automate billing for Secure Remote Backup. |
8/16 - Waiting for modified July data from Magida. Will charge July and August in August billing period through Twister.
9/2 - Completed changes in Twister to handle new type of Generic Transactions.
9/16 - Completed new report and sent to Magida and Darlene.
2/10 - Sent Magida email about working on the automation.
7/5 - Meeting with Magida to review status of "automation". Mtg postponed by Darlene until 7/23.
8/28 - Completed DRAFT of technical specs
10/26- Magida and CrashPlanPro had a conf call and they agreed to move forward with an export script. Magida will keep us posted.
1/12 - Magida rec'd SoW for custom API for CrashPlanPro. Chris reviewed and provided feedback.
2/26 - Checked with Magida on status. Project will be delayed due to several new initatives and an upgrade with CrashPlanPro.
5/29 - Peter said sample file would be ready within a week.
|
| Networking/Telecom |
CM |
10/1/2011 |
1/31/2012 |
Design process to sync org/dept names in Mysoft and Twister with Penn Community table
and also update lastname field in Mysoft to match org. |
|
| Dawn,NCCS |
CM |
2/1/2013 |
|
Assist NCCS with Auth Code reporting/cleanup |
2/1 - Dawn requested report of auth codes and associated usage
2/22 - Provided Dawn with report of auth codes used since 9/1/2012.
|
Work on Hold
| ISC Division |
Programmer |
Start Date (mm/dd/yyyy) |
Expected Completion Dt |
Brief Description |
Comments |
| TSS |
CM,DD,KN,MP |
1/1/2013 |
ON HOLD |
Design, Develop and Implement Automation for TSS billing |
2/27 - Kickoff Mtg scheduled
4/1 - Documented and distributed 4 options
4/12 - Mark Aseltine asked the project be put on hold pending Kristin having full staff.
4/15 - Next mtg - Cancelled |
| Networking |
CM |
3/12/2013 |
ON HOLD |
Modify Network Billing Periods |
3/12 - Wrote and distributed proposal to billing staff
3/20 - Mtg with billing staff to discuss proposal
3/21 - Spoke with Rox regarding proposal.
3/25 - Monir sent modified proposal to Mike/Gary. Mike approved it. Gary had questions and needed more information that Monir provided.
3/27 - Sent proposal to Rox and asked if the Comptroller's Office would like to meet and discuss this further.
4/4 - Sent Russ Dileo email.
4/5 - Gary put project on hold.
4/29 - Responded to Russ's email and updated him on project status.
|
| Networking/Telecom |
CM |
1/1/2013 |
ON HOLD |
Next Generation Billing System |
1/18/2013 - Began work on PMAP Project Proposal
1/31/2013 - Mailed Project Proposal to Mike/Gary
2/13/2013 - Mtg with Mike/Dawn/Monir. Project put on hold until July. |
| Dawn,NCCS |
CM |
1/17/2013 |
ON HOLD |
Assist NCCS with Octel reconciliation/cleanup. |
1/21 - Sent Cliff list of 44 discrepancies.
2/26 - Heard back on 25. But nothing since. Sent email to Cliff inquiring about status.
3/5 - Mike P requested reports of Octel accounts billing in Mysoft by cnac so Sarah could work on migrating them to Asterisk.
3/21 - Cliff responded that the reconciliation project between what is in Octel and what is actually billing through Mysoft
is on the back burner-he's working on ACD now.
5/7 - Dawn requested and was sent a new report of Octel mailboxes, including ones charged to Dept Users.
|
| Networking |
CM |
11/8/2011 |
ON HOLD |
Investigate replacing "pobox" references with "zimbra" in email billing records in Twister. |
11/8 - Sent Zimbra Support an email to get this started.
11/17- Too many changes needed on the acct mgmt side for this to work right now. Leave Twister data alone per Peggy,John,Matt. |
| Dawn,NCCS |
CM,DA,TH |
4/2012 |
ON HOLD |
White Pages billing: Work with Dawn/Tom to obtain billing info and start charging clients as of July 2012 |
4/16/2012 - Dawn provided report of phone numbers for which we are getting charged for white pages listings.
She requested billing group provide contact and budget code associated with the phone numbers on the list.
5/21/2012 - Chris completed analysis and provided results to Dawn.
5/30/2012 - Dawn indicated she was sending out the notices and she would get back to us with the customers who want to
keep this service so we can setup charges in Mysoft.
1/23/2013 - Dawn indicated this project was on HOLD until the end of February.
3/14/2013 - No word from Dawn on this. |
Work Not Yet in Progress
| ISC Division |
Brief Description |
Comments |
| Networking |
Work with Chris Cook and investigate the inclusion of Video ports (regular and greek) in Iris. |
|
| Telecom |
Revisit Location issue for phone #'s to possibly include floor. PPS and Mysoft both have the capability to store floor data, but OMS would need to be
modified to include this field. Currently the PPS floor field defaults to 1 for ALL numbers. |
|
| Telecom |
Analyze creation of appearance transactions in Mysoft. Without charges, should we still be creating and uploading them? |
|
| N&T |
Analyze and possibly create a datacheck or report to show which phone numbers have duplicated bldg codes in the room fld. |
9/24/2012: See emails with Reni |
| Networking |
Investigate Using BOX service in place of the LAN for storage of files. |
|
| Networking |
Add Account Validation to BIU import |
9/20/2012: Finished - pending implementation in Production. |
| Telecom |
Add new datacheck to Mysoft to report on phone numbers that have different budget codes for usage. |
|
| Telecom |
Add new datacheck to Mysoft for equip/svcs records under a single UserID that have different budget codes. |
|
| Finance |
Quarterly Admin Billing: Automate |
|
| Networking |
Develop a Reporting Tool for OMS - to be used by Finance Staff |
Learned in 7/2011 that things like "Contractor" reports will need to be written by us. |
| Networking |
Create new spreadsheet of Outlet Types by Cnac to be included with the monthly stats. Just wireless or all? See net_cnt_by_cnac report and script.
|
2/1/2010: Requested by Mark Wehrle |
Hot Issues
| Lead |
Report Date |
Brief Description |
Status |
|